Nuote Metals May Day Holiday Schedule – Production & Shipments on Track

2026-04-30 - Leave me a message

Holiday Dates & Order Cut‑off

Nuote Metals will observe the May Day holiday from May 1 to May 5, 2026 (5 days). Normal factory operations resume on May 6.


To ensure continuous supply, we recommend placing orders by April 25 for any rivets, eyelets, stamping parts, or turning parts that need to ship before the holiday.


Action Deadline
Order confirmation (stock products) April 26
Custom size order confirmation April 22
Last shipment day before holiday April 30
Resumed shipping May 6

All rivets and eyelets orders confirmed by April 25 will be produced and shipped on schedule. We have increased raw material inventory by 30% to cover urgent requests during the break.

Real Production Case – 1.2 Million Components Prepared

A Canadian automotive supplier placed an order in early April for 1.2 million mixed components: rivets (solid aluminium, 400k pcs), eyelets (brass C26800, 350k pcs), stamping parts (steel terminal clips, 300k pcs), and turning parts (brass standoffs, 150k pcs).


How we managed the holiday risk:


We split production into two lines and finished all 1.2 million pieces by April 28.

Final inspection reports (including dimensional, tensile, and salt spray data) were sent to the buyer on April 29.

The shipment left Shenzhen port on April 30 – two days before the holiday.


Real‑world use: The stamping parts and turning parts are used in PCB mounting brackets; the rivets and eyelets secure cable harnesses inside engine compartments (‑40°C to +150°C rated).


Detailed Parameters & Batch Certificates

Every product line shipped before the holiday follows our standard published specifications.


Product Material Key Parameter Test Method
Solid rivets – round head Aluminium 5052 Shear strength ≥180 MPa ASTM F606
Brass eyelets – flat flange C26800 Inner dia tolerance ±0.05mm Laser micrometer
Stamping parts – terminal clip Cold‑rolled steel SPCC Hardness HRB 45–60 ASTM E18
Turning parts – standoff Brass C3604 Thread class 6H GO/NO‑GO gauge


Certificates available per batch (no extra fee):


  • ISO 9001:2015 (TÜV SÜD)
  • RoHS / REACH – SGS batch certificates
  • Mill test reports for all turning parts and stamping parts raw coils


Transparency policy: We publish the actual test results of each batch on request. No generic certificates. If a batch fails any parameter, we re‑produce at our cost.


How We Support You During the Holiday (May 1–5)

Sales & quoting: Email and website form are monitored daily. Expect replies within 12 hours (longer on May 1 only).

Technical questions: Our engineering team is on call for urgent stamping parts or turning parts drawing reviews.

Emergency small orders: We keep stock of 20 most common rivets and eyelets sizes in our warehouse. These can be shipped on May 6 immediately.


What does not change:

Our quality policy stays active. Any product shipped after the holiday still meets the same ASTM / ISO standards.

No price change for orders placed during the holiday.

FAQ – May Day Holiday & Components Supply

Q1: I need rivets urgently during your May Day holiday. Can you still process my order?


A1: Yes. Our sales team remains available through email and the website inquiry form. We will confirm your rivets order within 12 hours. Physical production will start on May 6. However, if you need eyelets or stamping parts from our common stock list (free to request), we can arrange a one‑time express shipment on May 3 – a small logistics team works half‑day that date. Please contact us before April 30 to check stock availability. Express shipping costs are borne by the buyer.


Q2: How do I verify the quality of turning parts or stamping parts if I order during the holiday?


A2: We have a clear policy for holiday orders. After you submit your order, we will send you a pre‑production document package within 24 hours. This includes: raw material mill certificates (for turning parts brass or steel), earlier batch test records of similar stamping parts (tensile, hardness, dimensional), and a sample inspection plan using our calibrated CMM. Production does not begin until you approve these documents. For turning parts with critical tolerances (±0.01 mm), we also offer a live video inspection on May 6 before machining starts. All this is standard procedure – no extra charge.


Q3: Do you offer discounts for orders placed before the holiday to compensate for the delay?


A3: We do not artificially raise or lower prices for holiday timing. However, we do offer a transparent early‑order benefit: Any order for rivets, eyelets, stamping parts, or turning parts confirmed by April 25 receives a free upgrade to priority production (normally a paid service). This moves your batch ahead of non‑priority orders after the holiday, reducing your effective lead time by 5–7 days. Additionally, we include a complimentary set of 100 extra pieces per product line for dimensional validation – you can test fit before the main batch arrives. This offer is automatically applied, no coupon needed.


Contact & Next Steps

Order before April 25 to secure pre‑holiday shipment.


Get a quote: www.nuotemetal.com/contact


Download our ISO 9001 certificate and sample inspection report – free PDF upon request.


Nuote Metals Technology Co., Ltd. – Dongguan, China

Real certificates. Real test data. Real responsibility.




Send Inquiry

X
We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. By using this site, you agree to our use of cookies. Privacy Policy